NHS TRUST STAFF ROOM REFURBISHMENT
SERVICE(S):
Rejuvenating the existing staff room. A standard refurbishment to brighten up the room and assist with brightening work hours for staff.
SCOPE:
-
Remove and dispose of the existing floor coverings.
-
Install new Polyflor Standard PUR throughout and Polysafe non slip safety flooring around the wash basin area.
-
Replace the existing defective vertical blinds.
-
Remove the existing diffusers and clean, replace 1500mm long fluorescent tubes and starters to the existing lights and reinstate diffusers.
-
Adapt the existing power circuits to provide 3 no. additional double sockets in the kitchen area and in single socket c/w switched spur for new fridge position.
-
Remove the existing wall / base units / sink / taps etc. and dispose of.
-
Supply and install base units, stainless steel sink and monobloc taps, wall units, and Trespa high pressure laminate worktop. Supply and install white rock splashbacks.
-
Remove and dispose of notice boards, remove and set aside for reinstatement.
-
Prepare and decorate all previously painted surfaces with Diamond eggshell to walls / ceilings and undercoat / gloss coat to the woodwork.
CONTRACT VALUE:
£15,000